IT Solutions. ORACLE AND ERP

Our QA Testing Skills Enhances Your Technology Efficiencies

Oracle Testing Services / Oracle ERP

VXI’s application testing pool resources are expert in their business domain and technology. Our resources are well experienced in using various application testing tools like HP’s QTP, Win Runner, Load Runner etc. at various stages of the project.

Our Testing services include

  • Project planning
  • Preparing test cases
  • Preparing test scripts
  • Automation
  • Performing various types of testing like White Box testing, Black box testing, Functionality Testing, GUI Testing, Regression Testing, System testing, Integration testing, Unit testing, Load testing, Performance testing and User Acceptance testing.

 Functional and Regression Testing, GUI testing

With the use of tools like HP / Mercury Win Runner and Quick Test Professional for testing the Java-based applications and ERP/CRM solutions application Throughout the lifecycle.

VXI’s utilization of the HP tool suite (QC, QTP, LR etc.), your organization gains several advantages, including:

Optimized testing efforts by covering diverse environments with a single testing tool

  • Reduced testing time by automating repetitive tasks
  • Maximized return on investment through modifying and reusing test scripts as the application evolves

 Performance testing & Load testing

We use Load Runner for testing Client/Server system, CPU performance, I/O delays and load testing throughout the ERP/CRM application.

Using Load Runner, we are able to identify performance bottlenecks and enhance the performance of applications, meeting the SLAs of our customers. We’ve found that Load Runner reports are accepted as an industry standard for meeting performance targets. 

Defect Tracking Tool

We use the HP Quality Center / Bugzilla (open source) as defect tracking tool. Using these tools, multiple groups throughout our organization / clients can contribute to the quality process:

  • Business analysts define application requirements and testing objectives
  • Test managers and project leads design test plans and develop test cases.
  • Test automation engineers create automated scripts and store them in the repository
  • QA testers run manual and automated tests, report execution results, and enter defects
  • Developers review and fix defects logged into the database
  • Project managers create application status reports and manage resource allocation
  • Product managers decide whether an application is ready to be released

VXI’s QA/Testing Team utilizes Oracle best practices, by using 4 stages (DEV, TEST, QA and PROD) in our process of testing in an Oracle Environment.  – The DEV instance is the developer’s playpen where you can check your Oracle test for basic functionality.

  • Test the change in a DEV instance
  • Test the change in a TEST instance
  • Test the change in the QA instance
  • Final Oracle test in PROD

VXI’s Testing Team follows Oracle best practices because it mandates an as-complete real-world test as possible, with real production loads and real production data.